
Integration of conveyors, machines and robots; OEE monitoring through PLC, HMI, SCADA and MES connectivity.
Project-based quotation
In line automation the robot is only one link. Conveyors, machines, sensors and data systems must work together. Eksen designs the electrical-automation project of the line from scratch or integrates into existing lines.
Services
- Electrical panel design and manufacturing (UL/CE)
- PLC programming, HMI and SCADA interface
- Factory data collection via OPC UA / MQTT
- OEE, downtime analysis and traceability reports
- MES and ERP integration
To modernize your existing line without halting production, we prepare a phased transition plan.
Scope of service
- Electrical panel design and manufacturing
- OPC UA / MQTT data collection
- OEE and downtime analysis
- MES / ERP integration
PLC / SCADA and Line Automation — get a quote
Fill in the form and we will get back to you as soon as possible.
Frequently asked questions
How fast does a robot investment pay back?
The average payback in our projects is 14 months; 10-12 months for mobile cobot stations and 15-19 months for multi-robot welding lines. It depends on shifts, operator cost and scrap reduction. Our ROI calculator gives a first estimate.
What is the difference between a cobot and a traditional robot?
Cobots, thanks to force and speed limitation, work beside people without safety cages in most applications, are taught by hand and install quickly, but are limited in payload (3-30 kg) and speed. Traditional robots suit serial production requiring high speed and payload.
How many weeks does it take to deliver a cell?
Cobot stations take 4-8 weeks, standard robot cells 12-20 weeks and multi-robot lines 24-36 weeks. Feasibility and simulation add 2-3 weeks.
Can a robot be integrated with my existing machines?
Yes. We integrate with CNC machines, presses and injection molding machines regardless of brand and age. Adding machine-door automation and an I/O interface is usually enough.
How do you comply with safety standards?
A risk assessment per ISO 10218-2 and the Machinery Directive is made for every cell; safety functions are designed to ISO 13849 PL d. In cobot applications ISO/TS 15066 force and pressure measurements are made and a CE declaration of conformity is issued.